A step-by-step video guide for builders of the popular Zenith CH701 aircraft kit, this one featuring a step by step demonstration of the construction of the 701 slats, flaps, and struts which is the 2nd phase of the wing construction.
Many of the cosmetic deficiencies in our projects are the result of building errors. It is not hard to imagine that a near perfect job is practically impossible when we attempt a procedure for the very first time. By watching someone else make the bend, drill the hole, cut the part - we have a much better chance of doing it right. The result is a better looking, safer aircraft. Learn from others' mistakes and experience!
Make use of the experience of those that have prior experience building this plane! You may use these videos to build in any order you choose. It is recommended to start with the Metalworking101, then proceed with either the Horizontal Tail volume or the Rear Fuselage volume.
Some of the demonstrations in this video include:
Orders placed before 2 PM Mountain Standard Time (MST) Monday-Friday (except holidays) are shipped out the same day. FedEx Overnight, 2nd Day, and Express Saver requests must be placed by 1 PM Mountain Standard Time (MST) for same day shipping.